Our company is providing total solutions for air defense and defense procurement:
MODERNIZATION
2K11 KRUG SA-4
2K12 KVADRAT SA-6
9A33BMZ
S-200 WEGA (SA-5, GAMMON)
Thermovision television optical identification system
Dehumidification devices
REPRESENTATION
ALST - laser range finder
Fraser Volpe Corp - stabilized binoculars five control system
EO Imaging - video tracking devices
PROCUREMENT
Procurement services
CONTACT US
Address, phone, fax
   
   


All the military equipment, design, production, and services
belongs to Wojskowe Zaklady Uzbrojenia www.wzu.pl 

Modernization of the 2K11 KRUG (SA-4, GANEF) Anti-Aircraft Missile System
Range of modernization comprises the following:
  • Modernization of the 1S32M2 Surveillance and Tracking Station.
  • Modernization of the 2P24M2 self-propelled launcher.
Range of modernization of the 1S32M Missile Tracking Station:
  1. Replacement of energy-consuming tube power supply units voltage up to 300V with modern semiconductor power suppliers furnished with protection system against short-circuit.
  2. Replacement of the TWT traveling wave tubes in the receiving systems with semiconductor low-noise amplifiers. The UW1023 Traveling Wave Tubes are to be replaced.
  3. Replacement of the Moving Target Indicator unit based on storage tubes with the unit based on digital semiconductor systems of large scale of integration.
  4. Replacement of the television camera and the WPU-44 indicator with a modern CCD camera equipped with a zoom lens and LCD display.
  5. Replacement of the synchronizer tube units with a maintenance-free semiconductor LSI unit.
  6. Replacement of the BAUN scaler electromechanical and mechanical amplifiers compensation unit with contactless LSI unit.
  7. Replacement of the encoder tube units with a maintenance-free semiconductor LSI unit.
  8. Replacement of the scaler tube amplifiers with stable semiconductor amplifiers.
Range of modernization of the 2P24M2 launcher:

Replacement of the 3B3 power supplier with a modern semiconductor power supplier protected against short-circuit. In the place of the old 3B3 tube power supplier, a new 3B3-P1 is installed.


© 2003 by MTI Defence Solutions, Inc.